Power by county
Calhoun, AL: data center power outlook
For Calhoun, Alabama, the public grid picture begins with its place in an area outside an organized wholesale market and the infrastructure mapped inside the county. Grid access across Calhoun tops out at 230 kV, over a footprint of 81 mapped substations. In Calhoun, 4 utilities share the retail territory, among them ALABAMA POWER CO, CHEROKEE ELECTRIC COOP, CITY OF PIEDMONT - (AL).
Grid position at a glance
- Serving utilities
- ALABAMA POWER CO, CHEROKEE ELECTRIC COOP, CITY OF PIEDMONT - (AL), COOSA VALLEY ELECTRIC COOP INC
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 81
- Industrial retail rate
- 7.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 4 serving utilities: 8.0 to 12.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 31 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 87,222 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Calhoun
This page gathers the public grid evidence for Calhoun, Alabama that bears on a large new load. The strongest mapped access in Calhoun is 230 kV, squarely transmission class. Calhoun carries 81 substations, a dense footprint across the county.
No organized wholesale market covers Calhoun, Alabama, so capacity moves through the local utility and bilateral agreements. The state industrial average retail rate is 7.7 cents per kWh, drawn from EIA-861 and applied to Calhoun at the state level rather than as a county rate. The serving utilities in Calhoun that publish a rate range 3 of 4 serving utilities: 8.0 to 12.9¢/kWh, a spread kept separate from the state average.
For Calhoun, Alabama, no queued project appears in the feeds currently covered. The federal EIA-860M inventory files no planned or under-construction generation in Calhoun, Alabama, a real zero rather than a gap. Grid carbon intensity for Calhoun, via its balancing authority, is 842.741 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Calhoun at 30.67 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Calhoun, about 87,222 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Calhoun figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Calhoun, Alabama qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Calhoun, Alabama turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Calhoun, Alabama traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.