Power by county

Dallas, AL: data center power outlook

Dallas, Alabama is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Dallas carries 30 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in Dallas spans 4 utilities, with ALABAMA POWER CO, BLACK WARRIOR ELEC MEMBER CORP, CENTRAL ALABAMA ELECTRIC COOP among those mapped.

Grid position at a glance

Serving utilities
ALABAMA POWER CO, BLACK WARRIOR ELEC MEMBER CORP, CENTRAL ALABAMA ELECTRIC COOP, PIONEER ELECTRIC COOP, INC - (AL)
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
230 kV
Substations in county
30
Industrial retail rate
7.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 4 serving utilities: 8.0 to 12.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
95 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
843 lb CO2/MWh
Water withdrawals
53 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
21,024 employed in construction within ~120 km (21 of 22 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Dallas

What follows is a screening-grade read of Dallas, Alabama, built only from named public datasets. At 230 kV, Dallas sits in the transmission class that a large load would look to. The mapped layer packs 30 substations into Dallas, a dense spread of options.

Dallas, Alabama is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Dallas, the rate shown is the state industrial average of 7.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Dallas that report an industrial rate span 3 of 4 serving utilities: 8.0 to 12.2¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Dallas, Alabama in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. EIA-860M records 95 MW planned or under construction for Dallas. Dallas sits under a balancing authority that eGRID puts at 842.741 lb CO2 per MWh.

Dallas withdrew 53.34 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 21,024 people are employed in construction within a 120 km commute of Dallas (BLS QCEW), which frames staffing distance rather than free labour.

For Dallas, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Dallas, Alabama describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Dallas, Alabama, a specific address needs its own interconnection study, which this page does not attempt. The figures for Dallas, Alabama refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources