Limestone, AL: data center power outlook
Limestone, Alabama is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Limestone carries 28 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Limestone spans 6 utilities, with ALABAMA POWER CO, CITY OF ATHENS - (AL), CITY OF FLORENCE - (AL) among those mapped.
Grid position at a glance
- Serving utilities
- ALABAMA POWER CO, CITY OF ATHENS - (AL), CITY OF FLORENCE - (AL), CITY OF HUNTSVILLE - (AL), DECATUR UTILITIES, JOE WHEELER ELEC MEMBER CORP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 28
- Industrial retail rate
- 7.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 6 serving utilities: 5.9 to 8.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 641 lb CO2/MWh
- Water withdrawals
- 2,873 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 32,105 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Limestone
What follows is a screening-grade read of Limestone, Alabama, built only from named public datasets. Grid access in Limestone extends to 500 kV, a high-voltage line class. The mapped layer packs 28 substations into Limestone, a dense spread of options.
Limestone, Alabama is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Limestone, the rate shown is the state industrial average of 7.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Limestone that report an industrial rate span 6 serving utilities: 5.9 to 8.0¢/kWh, shown as context and never as the county rate.
The covered queue feeds list nothing for Limestone, Alabama, which may be quiet or simply uningested. Nothing is on file for Limestone, Alabama in EIA-860M as planned or under construction, which counts as a measured zero. Limestone sits under a balancing authority that eGRID puts at 641.018 lb CO2 per MWh.
Limestone withdrew 2,873.04 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 32,105 people are employed in construction within a 120 km commute of Limestone (BLS QCEW), which frames staffing distance rather than free labour.
For Limestone, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Limestone, Alabama describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Limestone, Alabama, a specific address needs its own interconnection study, which this page does not attempt. The figures for Limestone, Alabama refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.