Power by county

St. Clair, AL: data center power outlook

St. Clair, Alabama is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. St. Clair carries 30 mapped substations within its boundary, and the highest reachable grid access is 230 kV. Service in St. Clair spans 2 utilities, with ALABAMA POWER CO, COOSA VALLEY ELECTRIC COOP INC among those mapped.

Grid position at a glance

Serving utilities
ALABAMA POWER CO, COOSA VALLEY ELECTRIC COOP INC
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
230 kV
Substations in county
30
Industrial retail rate
7.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 serving utilities: 8.0 to 12.9¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
843 lb CO2/MWh
Water withdrawals
18 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
60,019 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in St. Clair

The material below frames St. Clair, Alabama for a prospective large load, drawing only on public sources. At 230 kV, St. Clair sits in the transmission class that a large load would look to. The mapped layer packs 30 substations into St. Clair, a dense spread of options.

Because St. Clair, Alabama sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For St. Clair, the rate shown is the state industrial average of 7.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving St. Clair that report an industrial rate span 2 serving utilities: 8.0 to 12.9¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for St. Clair, Alabama in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. St. Clair, Alabama has no EIA-860M generation on file, which reads as zero rather than as a gap. St. Clair sits under a balancing authority that eGRID puts at 842.741 lb CO2 per MWh.

St. Clair withdrew 18.33 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 60,019 people are employed in construction within a 120 km commute of St. Clair (BLS QCEW), which frames staffing distance rather than free labour.

For St. Clair, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for St. Clair, Alabama describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in St. Clair, Alabama, a specific address needs its own interconnection study, which this page does not attempt. The figures for St. Clair, Alabama refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources