Baxter sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Baxter, Arkansas, drawn from public datasets. Counting from the mapped infrastructure, Baxter holds 19 mapped substations and reaches 161 kV. Baxter is covered by 4 retail service territories, including ENTERGY ARKANSAS LLC, HOWELL-OREGON ELEC COOP, INC, NORTH ARKANSAS ELEC COOP, INC.
Grid position at a glance
- Serving utilities
- ENTERGY ARKANSAS LLC, HOWELL-OREGON ELEC COOP, INC, NORTH ARKANSAS ELEC COOP, INC, WHITE RIVER VALLEY EL COOP INC
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 161 kV
- Substations in county
- 19
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 4 serving utilities: 6.4 to 8.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 518 lb CO2/MWh
- Water withdrawals
- 4.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 10,653 employed in construction within ~120 km (21 of 26 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Baxter
Below, Baxter in Arkansas is described from public data as a starting point for siting diligence. Baxter reaches 161 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 19 substations mapped, Baxter has a moderate spread of interconnection points.
Baxter falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Baxter is the 6.7 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Baxter, reported per-utility industrial rates cover 2 of 4 serving utilities: 6.4 to 8.0¢/kWh, offered only as context beneath the state figure.
No interconnection-queue project is on record for Baxter, Arkansas in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Baxter, Arkansas has no EIA-860M generation on file, which reads as zero rather than as a gap. The balancing authority covering Baxter carries a grid carbon intensity of 518.094 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Baxter are 4.75 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Baxter, some 10,653 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Baxter are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Baxter, Arkansas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Baxter, Arkansas is an address-level interconnection study; the county figures here only narrow where to look. For Baxter, Arkansas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.