Cleburne sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Cleburne, Arkansas, drawn from public datasets. Counting from the mapped infrastructure, Cleburne holds 14 mapped substations and reaches 161 kV. Cleburne is covered by 3 retail service territories, including ENTERGY ARKANSAS LLC, FIRST ELECTRIC COOP CORP, PETIT JEAN ELECTRIC COOP CORP.
Grid position at a glance
- Serving utilities
- ENTERGY ARKANSAS LLC, FIRST ELECTRIC COOP CORP, PETIT JEAN ELECTRIC COOP CORP
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 161 kV
- Substations in county
- 14
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 serving utilities: 6.4 to 14.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 518 lb CO2/MWh
- Water withdrawals
- 12 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 24,679 employed in construction within ~120 km (20 of 24 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Cleburne
Below, Cleburne in Arkansas is described from public data as a starting point for siting diligence. Cleburne reaches 161 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 14 substations mapped, Cleburne has a moderate spread of interconnection points.
Cleburne falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Cleburne is the 6.7 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Cleburne, reported per-utility industrial rates cover 3 serving utilities: 6.4 to 14.1¢/kWh, offered only as context beneath the state figure.
The covered queue feeds list nothing for Cleburne, Arkansas, which may be quiet or simply uningested. Nothing is on file for Cleburne, Arkansas in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering Cleburne carries a grid carbon intensity of 518.094 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Cleburne are 11.77 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Cleburne, some 24,679 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Cleburne are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Cleburne, Arkansas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Cleburne, Arkansas is an address-level interconnection study; the county figures here only narrow where to look. For Cleburne, Arkansas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.