Power by county

Conway, AR: data center power outlook

Conway, Arkansas is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Conway carries 13 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Conway spans 4 utilities, with CONWAY CORPORATION, ENTERGY ARKANSAS LLC, FIRST ELECTRIC COOP CORP among those mapped.

Grid position at a glance

Serving utilities
CONWAY CORPORATION, ENTERGY ARKANSAS LLC, FIRST ELECTRIC COOP CORP, PETIT JEAN ELECTRIC COOP CORP
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
500 kV
Substations in county
13
Industrial retail rate
6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 serving utilities: 6.4 to 14.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
3 projects, 385 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
16 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
27,526 employed in construction within ~120 km (22 of 25 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Conway

What follows is a screening-grade read of Conway, Arkansas, built only from named public datasets. Grid access in Conway extends to 500 kV, a high-voltage line class. The mapped layer places 13 substations across Conway, a moderate density.

Interconnection over Conway runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Conway, the rate shown is the state industrial average of 6.7 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Conway that report an industrial rate span 4 serving utilities: 6.4 to 14.1¢/kWh, shown as context and never as the county rate.

The queue feeds show 3 projects for Conway, totalling 385 MW of requested capacity. Conway, Arkansas has no EIA-860M generation on file, which reads as zero rather than as a gap. Conway sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.

Conway withdrew 16.13 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 27,526 people are employed in construction within a 120 km commute of Conway (BLS QCEW), which frames staffing distance rather than free labour.

For Conway, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Conway, Arkansas describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Conway, Arkansas, a specific address needs its own interconnection study, which this page does not attempt. The figures for Conway, Arkansas refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources