Power by county

Dallas, AR: data center power outlook

The grid around Dallas, Arkansas is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Dallas the mapped layer shows 4 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Dallas is split among 4 utilities, among them C & L ELECTRIC COOP CORP, ENTERGY ARKANSAS LLC, OUACHITA ELECTRIC COOP CORP.

Grid position at a glance

Serving utilities
C & L ELECTRIC COOP CORP, ENTERGY ARKANSAS LLC, OUACHITA ELECTRIC COOP CORP, SOUTH CENTRAL ARK EL COOP, INC
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
500 kV
Substations in county
4
Industrial retail rate
6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 serving utilities: 6.4 to 9.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
1 projects, 500 MW
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
0.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
20,977 employed in construction within ~120 km (22 of 24 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Dallas

The sections below set out what public data shows about siting a large electrical load in Dallas, Arkansas. At 500 kV, Dallas carries high-voltage transmission at its strongest mapped point. Across Dallas, Arkansas, the mapped layer holds just 4 substations, so options gather at a handful of places.

Wholesale activity over Dallas clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Dallas carries the state industrial average retail rate of 6.7 cents per kWh from EIA-861, applied statewide. For Dallas, the per-utility spread is 4 serving utilities: 6.4 to 9.8¢/kWh, which qualifies but never replaces the state average.

Dallas carries 1 project in the interconnection queue, totalling 500 MW of requested capacity. The federal EIA-860M inventory files no planned or under-construction generation in Dallas, Arkansas, a real zero rather than a gap. In eGRID, the balancing authority over Dallas shows 981.982 lb CO2 per MWh.

For Dallas, the USGS 2015 compilation records 0.21 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Dallas sits within commuting range of roughly 20,977 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Dallas here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Dallas, Arkansas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Dallas, Arkansas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Dallas, Arkansas are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources