Desha sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Desha, Arkansas, drawn from public datasets. Counting from the mapped infrastructure, Desha holds 9 mapped substations and reaches 115 kV. Desha is covered by 7 retail service territories, including ASHLEY CHICOT ELEC COOP, INC, C & L ELECTRIC COOP CORP, COAHOMA ELECTRIC POWER ASSN.
Grid position at a glance
- Serving utilities
- ASHLEY CHICOT ELEC COOP, INC, C & L ELECTRIC COOP CORP, COAHOMA ELECTRIC POWER ASSN, DELTA ELECTRIC POWER ASSN, ENTERGY ARKANSAS LLC, ENTERGY MISSISSIPPI LLC, FIRST ELECTRIC COOP CORP
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 115 kV
- Substations in county
- 9
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 7 serving utilities: 6.4 to 9.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 424 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 669 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 5,129 employed in construction within ~120 km (22 of 27 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Desha
Below, Desha in Arkansas is described from public data as a starting point for siting diligence. Desha reaches 115 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 9 substations mapped, Desha has a moderate spread of interconnection points.
Desha falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Desha is the 6.7 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Desha, reported per-utility industrial rates cover 3 of 7 serving utilities: 6.4 to 9.8¢/kWh, offered only as context beneath the state figure.
Desha has 3 interconnection-queue projects on record, totalling 424 MW of requested capacity. Desha, Arkansas has no EIA-860M generation on file, which reads as zero rather than as a gap. The balancing authority covering Desha carries a grid carbon intensity of 981.982 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Desha are 668.9 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Desha, some 5,129 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Desha are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Desha, Arkansas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Desha, Arkansas is an address-level interconnection study; the county figures here only narrow where to look. For Desha, Arkansas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.