Faulkner, AR: data center power outlook
Faulkner sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Faulkner, Arkansas, drawn from public datasets. Counting from the mapped infrastructure, Faulkner holds 16 mapped substations and reaches 500 kV. Faulkner is covered by 4 retail service territories, including CONWAY CORPORATION, ENTERGY ARKANSAS LLC, FIRST ELECTRIC COOP CORP.
Grid position at a glance
- Serving utilities
- CONWAY CORPORATION, ENTERGY ARKANSAS LLC, FIRST ELECTRIC COOP CORP, PETIT JEAN ELECTRIC COOP CORP
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 500 kV
- Substations in county
- 16
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 serving utilities: 6.4 to 14.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 4 projects, 590 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 6.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 27,288 employed in construction within ~120 km (22 of 24 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Faulkner
Everything here about Faulkner, Arkansas comes from public federal and state records, with the gaps left visible. Faulkner reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 16 substations mapped, Faulkner has a moderate spread of interconnection points.
Faulkner falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Faulkner is the 6.7 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Faulkner, reported per-utility industrial rates cover 4 serving utilities: 6.4 to 14.1¢/kWh, offered only as context beneath the state figure.
Faulkner has 4 interconnection-queue projects on record, totalling 590 MW of requested capacity. Faulkner, Arkansas has no EIA-860M generation on file, which reads as zero rather than as a gap. The balancing authority covering Faulkner carries a grid carbon intensity of 981.982 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Faulkner are 6.38 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Faulkner, some 27,288 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Faulkner are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Faulkner, Arkansas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Faulkner, Arkansas is an address-level interconnection study; the county figures here only narrow where to look. For Faulkner, Arkansas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.