Jackson sits in the MISO market (Midcontinent Independent System Operator); what follows is the screening-grade grid picture for Jackson, Arkansas, drawn from public datasets. Counting from the mapped infrastructure, Jackson holds 8 mapped substations and reaches 500 kV. Jackson is covered by 4 retail service territories, including CITY WATER AND LIGHT PLANT, CRAIGHEAD ELECTRIC COOP CORP, ENTERGY ARKANSAS LLC.
Grid position at a glance
- Serving utilities
- CITY WATER AND LIGHT PLANT, CRAIGHEAD ELECTRIC COOP CORP, ENTERGY ARKANSAS LLC, FARMERS ELECTRIC COOP CORP - (AR)
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 500 kV
- Substations in county
- 8
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 4 serving utilities: 5.1 to 13.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 20 projects, 5,750 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 518 lb CO2/MWh
- Water withdrawals
- 598 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 14,570 employed in construction within ~120 km (23 of 26 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Jackson
Below, Jackson in Arkansas is described from public data as a starting point for siting diligence. Jackson reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 8 substations mapped, Jackson has a moderate spread of interconnection points.
Jackson falls inside the MISO market (Midcontinent Independent System Operator), which governs how its interconnection requests and capacity move. The rate for Jackson is the 6.7 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Jackson, reported per-utility industrial rates cover 3 of 4 serving utilities: 5.1 to 13.7¢/kWh, offered only as context beneath the state figure.
Jackson has 20 interconnection-queue projects on record, totalling 5,750 MW of requested capacity. Nothing is on file for Jackson, Arkansas in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering Jackson carries a grid carbon intensity of 518.094 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Jackson are 598.14 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Jackson, some 14,570 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Jackson are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Jackson, Arkansas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Jackson, Arkansas is an address-level interconnection study; the county figures here only narrow where to look. For Jackson, Arkansas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.