The grid around Newton, Arkansas is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Newton the mapped layer shows 3 mapped substations, with grid access reaching 161 kV at its strongest point. Retail service across Newton is split among 5 utilities, among them ARKANSAS VALLEY ELEC COOP CORP, CARROLL ELECTRIC COOP CORP - (AR), ENTERGY ARKANSAS LLC.

Grid position at a glance

Serving utilities
ARKANSAS VALLEY ELEC COOP CORP, CARROLL ELECTRIC COOP CORP - (AR), ENTERGY ARKANSAS LLC, OZARKS ELECTRIC COOP CORP - (AR), PETIT JEAN ELECTRIC COOP CORP
ISO / market
SPP (Southwest Power Pool)
Highest grid access
161 kV
Substations in county
3
Industrial retail rate
6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 serving utilities: 5.9 to 14.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
0.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
26,919 employed in construction within ~120 km (22 of 26 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Newton

Read on for the public power picture of Newton in Arkansas, assembled for data center siting. Transmission-class access reaches 161 kV in Newton at its strongest mapped point. Across Newton, Arkansas, the mapped layer holds just 3 substations, so options gather at a handful of places.

Wholesale activity over Newton clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Newton carries the state industrial average retail rate of 6.7 cents per kWh from EIA-861, applied statewide. For Newton, the per-utility spread is 5 serving utilities: 5.9 to 14.1¢/kWh, which qualifies but never replaces the state average.

Newton, Arkansas shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. The federal EIA-860M inventory files no planned or under-construction generation in Newton, Arkansas, a real zero rather than a gap. In eGRID, the balancing authority over Newton shows 981.982 lb CO2 per MWh.

For Newton, the USGS 2015 compilation records 0.37 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Newton sits within commuting range of roughly 26,919 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Newton here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Newton, Arkansas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Newton, Arkansas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Newton, Arkansas are logged directly below, so each figure on this page can be traced back to its public dataset.