Polk sits in the SPP market (Southwest Power Pool); what follows is the screening-grade grid picture for Polk, Arkansas, drawn from public datasets. Counting from the mapped infrastructure, Polk holds 16 mapped substations and reaches 138 kV. Polk is covered by 8 retail service territories, including CHOCTAW ELECTRIC COOP INC, ENTERGY ARKANSAS LLC, KIAMICHI ELECTRIC COOP, INC.
Grid position at a glance
- Serving utilities
- CHOCTAW ELECTRIC COOP INC, ENTERGY ARKANSAS LLC, KIAMICHI ELECTRIC COOP, INC, OKLAHOMA GAS & ELECTRIC CO, PUBLIC SERVICE CO OF OKLAHOMA, RICH MOUNTAIN ELEC COOP, INC, SOUTHWEST ARKANSAS E C C, SOUTHWESTERN ELECTRIC POWER CO
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 138 kV
- Substations in county
- 16
- Industrial retail rate
- 6.7¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 8 serving utilities: 6.4 to 7.5¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 3.2 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 10,274 employed in construction within ~120 km (21 of 22 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Polk
Everything here about Polk, Arkansas comes from public federal and state records, with the gaps left visible. Polk reaches 138 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 16 substations mapped, Polk has a moderate spread of interconnection points.
Polk falls inside the SPP market (Southwest Power Pool), which governs how its interconnection requests and capacity move. The rate for Polk is the 6.7 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Polk, reported per-utility industrial rates cover 4 of 8 serving utilities: 6.4 to 7.5¢/kWh, offered only as context beneath the state figure.
The covered queue feeds list nothing for Polk, Arkansas, which may be quiet or simply uningested. Nothing is on file for Polk, Arkansas in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering Polk carries a grid carbon intensity of 871.526 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Polk are 3.21 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Polk, some 10,274 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Polk are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Polk, Arkansas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Polk, Arkansas is an address-level interconnection study; the county figures here only narrow where to look. For Polk, Arkansas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.