Del Norte, CA: data center power outlook
Del Norte, California is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Del Norte carries 17 mapped substations within its boundary, and the highest reachable grid access is 115 kV. Service in Del Norte spans 5 utilities, with BONNEVILLE POWER ADMINISTRATION, COOS-CURRY ELECTRIC COOP, INC, PACIFIC GAS & ELECTRIC CO. among those mapped.
Grid position at a glance
- Serving utilities
- BONNEVILLE POWER ADMINISTRATION, COOS-CURRY ELECTRIC COOP, INC, PACIFIC GAS & ELECTRIC CO., PACIFICORP, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 115 kV
- Substations in county
- 17
- Industrial retail rate
- 21.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 5 serving utilities: 2.9 to 21.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 307 lb CO2/MWh
- Water withdrawals
- 20 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 5,225 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Del Norte
The material below frames Del Norte, California for a prospective large load, drawing only on public sources. At 115 kV, Del Norte sits in the transmission class that a large load would look to. The mapped layer places 17 substations across Del Norte, a moderate density.
Del Norte, California is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Del Norte, the rate shown is the state industrial average of 21.6 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Del Norte that report an industrial rate span 3 of 5 serving utilities: 2.9 to 21.1¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Del Norte, California carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M lists nothing planned or under construction for Del Norte, California, which is a national filing and so a real zero. Del Norte sits under a balancing authority that eGRID puts at 306.81 lb CO2 per MWh.
Del Norte withdrew 19.55 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 5,225 people are employed in construction within a 120 km commute of Del Norte (BLS QCEW), which frames staffing distance rather than free labour.
For Del Norte, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Del Norte, California describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Del Norte, California, a specific address needs its own interconnection study, which this page does not attempt. The figures for Del Norte, California refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.