Tehama, CA: data center power outlook
Tehama, California is served through the CAISO market (California Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Tehama carries 18 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Tehama spans 3 utilities, with PACIFIC GAS & ELECTRIC CO., TRINITY PUBLIC UTILITIES DIST, WAPA-- WESTERN AREA POWER ADMINISTRATION among those mapped.
Grid position at a glance
- Serving utilities
- PACIFIC GAS & ELECTRIC CO., TRINITY PUBLIC UTILITIES DIST, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- CAISO (California Independent System Operator)
- Highest grid access
- 500 kV
- Substations in county
- 18
- Industrial retail rate
- 21.6¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 3 serving utilities: 2.9 to 21.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 369 lb CO2/MWh
- Water withdrawals
- 539 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 11,004 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Tehama
What follows is a screening-grade read of Tehama, California, built only from named public datasets. Grid access in Tehama extends to 500 kV, a high-voltage line class. The mapped layer places 18 substations across Tehama, a moderate density.
Interconnection over Tehama runs through the CAISO market (California Independent System Operator) and its rules. For Tehama, the rate shown is the state industrial average of 21.6 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Tehama that report an industrial rate span 2 of 3 serving utilities: 2.9 to 21.1¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Tehama, California in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Nothing is on file for Tehama, California in EIA-860M as planned or under construction, which counts as a measured zero. Tehama sits under a balancing authority that eGRID puts at 369.346 lb CO2 per MWh.
Tehama withdrew 538.99 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 11,004 people are employed in construction within a 120 km commute of Tehama (BLS QCEW), which frames staffing distance rather than free labour.
For Tehama, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Tehama, California describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Tehama, California, a specific address needs its own interconnection study, which this page does not attempt. The figures for Tehama, California refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.