Power by county

Archuleta, CO: data center power outlook

The grid around Archuleta, Colorado is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Archuleta the mapped layer shows 3 mapped substations, with grid access reaching 115 kV at its strongest point. Retail service across Archuleta is split among 4 utilities, among them LA PLATA ELECTRIC ASSN, INC, NORTHERN RIO ARRIBA E COOP INC, PUBLIC SERVICE CO OF COLORADO.

Grid position at a glance

Serving utilities
LA PLATA ELECTRIC ASSN, INC, NORTHERN RIO ARRIBA E COOP INC, PUBLIC SERVICE CO OF COLORADO, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
115 kV
Substations in county
3
Industrial retail rate
9.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 4 serving utilities: 2.6 to 8.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
1,870 lb CO2/MWh
Water withdrawals
45 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
3,791 employed in construction within ~120 km (9 of 11 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Archuleta

The sections below set out what public data shows about siting a large electrical load in Archuleta, Colorado. Transmission-class access reaches 115 kV in Archuleta at its strongest mapped point. Archuleta, Colorado shows 3 substations in the mapped layer, a thin spread across the county.

No organized wholesale market covers Archuleta, Colorado, so capacity moves through the local utility and bilateral agreements. Archuleta carries the state industrial average retail rate of 9.1 cents per kWh from EIA-861, applied statewide. For Archuleta, the per-utility spread is 3 of 4 serving utilities: 2.6 to 8.0¢/kWh, which qualifies but never replaces the state average.

Archuleta, Colorado shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. The federal EIA-860M inventory files no planned or under-construction generation in Archuleta, Colorado, a real zero rather than a gap. In eGRID, the balancing authority over Archuleta shows 1,869.537 lb CO2 per MWh.

For Archuleta, the USGS 2015 compilation records 44.78 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Archuleta sits within commuting range of roughly 3,791 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Archuleta here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Archuleta, Colorado settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Archuleta, Colorado requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Archuleta, Colorado are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources