The grid around Fremont, Colorado is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Fremont the mapped layer shows 15 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Fremont is split among 7 utilities, among them BLACK HILLS COLORADO ELECTRIC, LLC, CORE ELECTRIC COOPERATIVE, PUBLIC SERVICE CO OF COLORADO.
Grid position at a glance
- Serving utilities
- BLACK HILLS COLORADO ELECTRIC, LLC, CORE ELECTRIC COOPERATIVE, PUBLIC SERVICE CO OF COLORADO, SAN ISABEL ELECTRIC ASSN, INC, SAN LUIS VALLEY R E C, INC, SANGRE DE CRISTO ELEC ASSN INC, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 15
- Industrial retail rate
- 9.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 6 of 7 serving utilities: 2.6 to 19.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 1,870 lb CO2/MWh
- Water withdrawals
- 104 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 54,617 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Fremont
The sections below set out what public data shows about siting a large electrical load in Fremont, Colorado. Transmission-class access reaches 230 kV in Fremont at its strongest mapped point. Fremont contains 15 mapped substations, a moderate footprint spread across the service area.
There is no organized wholesale market over Fremont, Colorado; arrangements run through the serving utility instead. Fremont carries the state industrial average retail rate of 9.1 cents per kWh from EIA-861, applied statewide. For Fremont, the per-utility spread is 6 of 7 serving utilities: 2.6 to 19.6¢/kWh, which qualifies but never replaces the state average.
For Fremont, Colorado, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Fremont, Colorado in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Fremont shows 1,869.537 lb CO2 per MWh.
For Fremont, the USGS 2015 compilation records 103.9 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Fremont sits within commuting range of roughly 54,617 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Fremont here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Fremont, Colorado settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Fremont, Colorado requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Fremont, Colorado are logged directly below, so each figure on this page can be traced back to its public dataset.