Mesa, CO: data center power outlook

Mesa sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Mesa, Colorado, drawn from public datasets. Counting from the mapped infrastructure, Mesa holds 26 mapped substations and reaches 345 kV. Mesa is covered by 6 retail service territories, including DELTA MONTROSE ELECTRIC ASSN, GRAND VALLEY POWER, HOLY CROSS ELECTRIC ASSN, INC.

Grid position at a glance

Serving utilities
DELTA MONTROSE ELECTRIC ASSN, GRAND VALLEY POWER, HOLY CROSS ELECTRIC ASSN, INC, PACIFICORP, PUBLIC SERVICE CO OF COLORADO, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
345 kV
Substations in county
26
Industrial retail rate
9.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 of 6 serving utilities: 2.6 to 12.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
202 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
803 lb CO2/MWh
Water withdrawals
850 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
9,139 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Mesa

Everything here about Mesa, Colorado comes from public federal and state records, with the gaps left visible. Mesa reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 26 substations mapped, Mesa offers interconnection points across many locations.

Because Mesa, Colorado sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. The rate for Mesa is the 9.1 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Mesa, reported per-utility industrial rates cover 5 of 6 serving utilities: 2.6 to 12.1¢/kWh, offered only as context beneath the state figure.

The covered queue feeds list nothing for Mesa, Colorado, which may be quiet or simply uningested. Mesa has 202 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Mesa carries a grid carbon intensity of 802.655 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Mesa are 850.34 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Mesa, some 9,139 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Mesa are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Mesa, Colorado together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Mesa, Colorado is an address-level interconnection study; the county figures here only narrow where to look. For Mesa, Colorado, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.