Mineral, Colorado is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Mineral carries 1 mapped substation within its boundary, and the highest reachable grid access is 69 kV. Service in Mineral spans 5 utilities, with GUNNISON COUNTY ELEC ASSN., LA PLATA ELECTRIC ASSN, INC, PUBLIC SERVICE CO OF COLORADO among those mapped.

Grid position at a glance

Serving utilities
GUNNISON COUNTY ELEC ASSN., LA PLATA ELECTRIC ASSN, INC, PUBLIC SERVICE CO OF COLORADO, SAN LUIS VALLEY R E C, INC, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
69 kV
Substations in county
1
Industrial retail rate
9.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 5 serving utilities: 2.6 to 19.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
1,870 lb CO2/MWh
Water withdrawals
7.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
4,555 employed in construction within ~120 km (9 of 11 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Mineral

What follows is a screening-grade read of Mineral, Colorado, built only from named public datasets. At 69 kV, the strongest mapped access in Mineral is sub-transmission class. Only 1 substation is mapped in Mineral, Colorado, keeping interconnection points few.

Mineral, Colorado is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Mineral, the rate shown is the state industrial average of 9.1 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Mineral that report an industrial rate span 4 of 5 serving utilities: 2.6 to 19.6¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Mineral, Colorado, which may be quiet or simply uningested. Mineral, Colorado has no EIA-860M generation on file, which reads as zero rather than as a gap. Mineral sits under a balancing authority that eGRID puts at 1,869.537 lb CO2 per MWh.

Mineral withdrew 7.29 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 4,555 people are employed in construction within a 120 km commute of Mineral (BLS QCEW), which frames staffing distance rather than free labour.

For Mineral, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Mineral, Colorado describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Mineral, Colorado, a specific address needs its own interconnection study, which this page does not attempt. The figures for Mineral, Colorado refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.