Power by county

Morgan, CO: data center power outlook

The grid around Morgan, Colorado is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Morgan the mapped layer shows 33 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Morgan is split among 4 utilities, among them CITY OF FORT MORGAN, HIGHLINE ELECTRIC ASSN, MORGAN COUNTY RURAL ELEC ASSN.

Grid position at a glance

Serving utilities
CITY OF FORT MORGAN, HIGHLINE ELECTRIC ASSN, MORGAN COUNTY RURAL ELEC ASSN, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
345 kV
Substations in county
33
Industrial retail rate
9.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 serving utilities: 2.6 to 12.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
558 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
1,870 lb CO2/MWh
Water withdrawals
142 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
91,071 employed in construction within ~120 km (8 of 9 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Morgan

The sections below set out what public data shows about siting a large electrical load in Morgan, Colorado. At 345 kV, Morgan carries high-voltage transmission at its strongest mapped point. Morgan contains 33 mapped substations, a dense footprint that spreads interconnection options across many points.

No organized wholesale market covers Morgan, Colorado, so capacity moves through the local utility and bilateral agreements. Morgan carries the state industrial average retail rate of 9.1 cents per kWh from EIA-861, applied statewide. For Morgan, the per-utility spread is 4 serving utilities: 2.6 to 12.4¢/kWh, which qualifies but never replaces the state average.

Morgan, Colorado shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. In Morgan, 557.7 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Morgan shows 1,869.537 lb CO2 per MWh.

For Morgan, the USGS 2015 compilation records 141.98 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Morgan sits within commuting range of roughly 91,071 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Morgan here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Morgan, Colorado settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Morgan, Colorado requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Morgan, Colorado are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources