Power by county
Pueblo, CO: data center power outlook
Pueblo, Colorado is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Pueblo carries 55 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Pueblo spans 6 utilities, with BLACK HILLS COLORADO ELECTRIC, LLC, MOUNTAIN VIEW ELEC ASSN, INC, SAN ISABEL ELECTRIC ASSN, INC among those mapped.
Grid position at a glance
- Serving utilities
- BLACK HILLS COLORADO ELECTRIC, LLC, MOUNTAIN VIEW ELEC ASSN, INC, SAN ISABEL ELECTRIC ASSN, INC, SOUTHEAST COLORADO POWER ASSN, SOUTHWESTERN ELECTRIC COOP INC - (NM), WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 345 kV
- Substations in county
- 55
- Industrial retail rate
- 9.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 6 serving utilities: 2.6 to 13.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 1,218 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 803 lb CO2/MWh
- Water withdrawals
- 344 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 23,685 employed in construction within ~120 km (8 of 10 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Pueblo
The material below frames Pueblo, Colorado for a prospective large load, drawing only on public sources. Grid access in Pueblo extends to 345 kV, a high-voltage line class. The mapped layer packs 55 substations into Pueblo, a dense spread of options.
Because Pueblo, Colorado sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For Pueblo, the rate shown is the state industrial average of 9.1 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Pueblo that report an industrial rate span 5 of 6 serving utilities: 2.6 to 13.6¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Pueblo, Colorado carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M records 1,218 MW planned or under construction for Pueblo. Pueblo sits under a balancing authority that eGRID puts at 802.655 lb CO2 per MWh.
Pueblo withdrew 343.79 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 23,685 people are employed in construction within a 120 km commute of Pueblo (BLS QCEW), which frames staffing distance rather than free labour.
For Pueblo, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Pueblo, Colorado describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Pueblo, Colorado, a specific address needs its own interconnection study, which this page does not attempt. The figures for Pueblo, Colorado refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.