Sedgwick, CO: data center power outlook

The grid around Sedgwick, Colorado is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Sedgwick the mapped layer shows 7 mapped substations, with grid access reaching 115 kV at its strongest point. Retail service across Sedgwick is split among 6 utilities, among them CITY OF JULESBURG - (CO), HIGH WEST ENERGY, INC, HIGHLINE ELECTRIC ASSN.

Grid position at a glance

Serving utilities
CITY OF JULESBURG - (CO), HIGH WEST ENERGY, INC, HIGHLINE ELECTRIC ASSN, MIDWEST ELECTRIC MEMBER CORP, NEBRASKA PUBLIC POWER DISTRICT, WAPA-- WESTERN AREA POWER ADMINISTRATION
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
115 kV
Substations in county
7
Industrial retail rate
9.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 6 serving utilities: 2.6 to 10.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
75 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
864 employed in construction within ~120 km (10 of 15 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Sedgwick

The sections below set out what public data shows about siting a large electrical load in Sedgwick, Colorado. Transmission-class access reaches 115 kV in Sedgwick at its strongest mapped point. Sedgwick contains 7 mapped substations, a moderate footprint spread across the service area.

No organized wholesale market covers Sedgwick, Colorado, so capacity moves through the local utility and bilateral agreements. Sedgwick carries the state industrial average retail rate of 9.1 cents per kWh from EIA-861, applied statewide. For Sedgwick, the per-utility spread is 3 of 6 serving utilities: 2.6 to 10.6¢/kWh, which qualifies but never replaces the state average.

Sedgwick, Colorado shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. No generation is filed as planned or under construction in Sedgwick, Colorado in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Sedgwick shows 871.526 lb CO2 per MWh.

For Sedgwick, the USGS 2015 compilation records 74.54 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Sedgwick sits within commuting range of roughly 864 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Sedgwick here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Sedgwick, Colorado settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Sedgwick, Colorado requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Sedgwick, Colorado are logged directly below, so each figure on this page can be traced back to its public dataset.