Levy, FL: data center power outlook
The grid around Levy, Florida is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Levy the mapped layer shows 22 mapped substations, with grid access reaching 230 kV at its strongest point. Retail service across Levy is split among 6 utilities, among them CENTRAL FLORIDA ELEC COOP, INC, CITY OF NEWBERRY - (FL), CITY OF WILLISTON - (FL).
Grid position at a glance
- Serving utilities
- CENTRAL FLORIDA ELEC COOP, INC, CITY OF NEWBERRY - (FL), CITY OF WILLISTON - (FL), CLAY ELECTRIC COOPERATIVE, INC, DUKE ENERGY FLORIDA, LLC, SUMTER ELECTRIC COOP, INC
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 22
- Industrial retail rate
- 8.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 6 serving utilities: 6.7 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 1,208 lb CO2/MWh
- Water withdrawals
- 19 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 61,470 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Levy
Read on for the public power picture of Levy in Florida, assembled for data center siting. Transmission-class access reaches 230 kV in Levy at its strongest mapped point. Levy contains 22 mapped substations, a dense footprint that spreads interconnection options across many points.
Levy, Florida lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Levy carries the state industrial average retail rate of 8.8 cents per kWh from EIA-861, applied statewide. For Levy, the per-utility spread is 4 of 6 serving utilities: 6.7 to 9.7¢/kWh, which qualifies but never replaces the state average.
For Levy, Florida, no queued project appears in the feeds currently covered. The federal EIA-860M inventory files no planned or under-construction generation in Levy, Florida, a real zero rather than a gap. In eGRID, the balancing authority over Levy shows 1,207.833 lb CO2 per MWh.
For Levy, the USGS 2015 compilation records 19.29 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Levy sits within commuting range of roughly 61,470 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Levy here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Levy, Florida settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Levy, Florida requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Levy, Florida are logged directly below, so each figure on this page can be traced back to its public dataset.