Power by county
Pasco, FL: data center power outlook
The grid around Pasco, Florida is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Pasco the mapped layer shows 61 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Pasco is split among 4 utilities, among them DUKE ENERGY FLORIDA, LLC, SUMTER ELECTRIC COOP, INC, TAMPA ELECTRIC CO.
Grid position at a glance
- Serving utilities
- DUKE ENERGY FLORIDA, LLC, SUMTER ELECTRIC COOP, INC, TAMPA ELECTRIC CO, WITHLACOOCHEE RIVER ELEC COOP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 61
- Industrial retail rate
- 8.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 serving utilities: 5.4 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 629 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 1,208 lb CO2/MWh
- Water withdrawals
- 76 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 199,858 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Pasco
The sections below set out what public data shows about siting a large electrical load in Pasco, Florida. At 500 kV, Pasco carries high-voltage transmission at its strongest mapped point. Pasco contains 61 mapped substations, a dense footprint that spreads interconnection options across many points.
There is no organized wholesale market over Pasco, Florida; arrangements run through the serving utility instead. Pasco carries the state industrial average retail rate of 8.8 cents per kWh from EIA-861, applied statewide. For Pasco, the per-utility spread is 4 serving utilities: 5.4 to 9.7¢/kWh, which qualifies but never replaces the state average.
Pasco, Florida shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. In Pasco, 629 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Pasco shows 1,207.833 lb CO2 per MWh.
For Pasco, the USGS 2015 compilation records 75.68 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Pasco sits within commuting range of roughly 199,858 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Pasco here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Pasco, Florida settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Pasco, Florida requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Pasco, Florida are logged directly below, so each figure on this page can be traced back to its public dataset.