Santa Rosa sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Santa Rosa, Florida, drawn from public datasets. Counting from the mapped infrastructure, Santa Rosa holds 32 mapped substations and reaches 230 kV. Santa Rosa is covered by 4 retail service territories, including ALABAMA POWER CO, CHOCTAWHATCHE ELEC COOP, INC, ESCAMBIA RIVER ELEC COOP, INC.
Grid position at a glance
- Serving utilities
- ALABAMA POWER CO, CHOCTAWHATCHE ELEC COOP, INC, ESCAMBIA RIVER ELEC COOP, INC, SOUTHERN PINE ELEC COOP, INC
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 230 kV
- Substations in county
- 32
- Industrial retail rate
- 8.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 1 of 4 serving utilities: 8.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 20 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 41,780 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Santa Rosa
Below, Santa Rosa in Florida is described from public data as a starting point for siting diligence. Santa Rosa reaches 230 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 32 substations mapped, Santa Rosa offers interconnection points across many locations.
Sitting outside any organized market, Santa Rosa, Florida handles interconnection through its utility rather than a central operator. The rate for Santa Rosa is the 8.8 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Santa Rosa, reported per-utility industrial rates cover 1 of 4 serving utilities: 8.6¢/kWh, offered only as context beneath the state figure.
The covered queue feeds list nothing for Santa Rosa, Florida, which may be quiet or simply uningested. Nothing is on file for Santa Rosa, Florida in EIA-860M as planned or under construction, which counts as a measured zero. The balancing authority covering Santa Rosa carries a grid carbon intensity of 842.741 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Santa Rosa are 19.86 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Santa Rosa, some 41,780 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Santa Rosa are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Santa Rosa, Florida together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Santa Rosa, Florida is an address-level interconnection study; the county figures here only narrow where to look. For Santa Rosa, Florida, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.