Power by county
Seminole, FL: data center power outlook
Seminole sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Seminole, Florida, drawn from public datasets. Counting from the mapped infrastructure, Seminole holds 30 mapped substations and reaches 500 kV. Seminole is covered by 5 retail service territories, including CITY OF WINTER PARK - (FL), DUKE ENERGY FLORIDA, LLC, FLORIDA POWER & LIGHT CO.
Grid position at a glance
- Serving utilities
- CITY OF WINTER PARK - (FL), DUKE ENERGY FLORIDA, LLC, FLORIDA POWER & LIGHT CO, REEDY CREEK IMPROVEMENT DIST, SUMTER ELECTRIC COOP, INC
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 30
- Industrial retail rate
- 8.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 5 serving utilities: 8.0 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 597 lb CO2/MWh
- Water withdrawals
- 64 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 158,589 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Seminole
Everything here about Seminole, Florida comes from public federal and state records, with the gaps left visible. Seminole reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 30 substations mapped, Seminole offers interconnection points across many locations.
Seminole, Florida is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. The rate for Seminole is the 8.8 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Seminole, reported per-utility industrial rates cover 3 of 5 serving utilities: 8.0 to 9.7¢/kWh, offered only as context beneath the state figure.
The covered queue feeds list nothing for Seminole, Florida, which may be quiet or simply uningested. EIA-860M lists nothing planned or under construction for Seminole, Florida, which is a national filing and so a real zero. The balancing authority covering Seminole carries a grid carbon intensity of 597.091 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Seminole are 64.35 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Seminole, some 158,589 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Seminole are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Seminole, Florida together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Seminole, Florida is an address-level interconnection study; the county figures here only narrow where to look. For Seminole, Florida, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.