Power by county
Atkinson, GA: data center power outlook
The grid around Atkinson, Georgia is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Atkinson the mapped layer shows 5 mapped substations, with grid access reaching 115 kV at its strongest point. Retail service across Atkinson is split among 5 utilities, among them COLQUITT ELECTRIC MEMBERSHIP CORP, GEORGIA POWER CO, IRWIN ELECTRIC MEMBERSHIP CORP.
Grid position at a glance
- Serving utilities
- COLQUITT ELECTRIC MEMBERSHIP CORP, GEORGIA POWER CO, IRWIN ELECTRIC MEMBERSHIP CORP, SATILLA RURAL ELEC MEMBER CORPORATION, SLASH PINE ELEC MEMBER CORP
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 115 kV
- Substations in county
- 5
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 5 serving utilities: 5.1 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 3.1 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 11,720 employed in construction within ~120 km (32 of 36 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Atkinson
Read on for the public power picture of Atkinson in Georgia, assembled for data center siting. Transmission-class access reaches 115 kV in Atkinson at its strongest mapped point. Atkinson, Georgia contains 5 mapped substations, a sparse footprint that concentrates interconnection options at a few points.
Atkinson, Georgia lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Atkinson carries the state industrial average retail rate of 7.8 cents per kWh from EIA-861, applied statewide. For Atkinson, the per-utility spread is 3 of 5 serving utilities: 5.1 to 10.8¢/kWh, which qualifies but never replaces the state average.
Atkinson, Georgia has nothing in the interconnection queue across the feeds covered here, quiet or uningested. The federal EIA-860M inventory files no planned or under-construction generation in Atkinson, Georgia, a real zero rather than a gap. In eGRID, the balancing authority over Atkinson shows 842.741 lb CO2 per MWh.
For Atkinson, the USGS 2015 compilation records 3.09 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Atkinson sits within commuting range of roughly 11,720 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Atkinson here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Atkinson, Georgia settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Atkinson, Georgia requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Atkinson, Georgia are logged directly below, so each figure on this page can be traced back to its public dataset.