Power by county

Bibb, GA: data center power outlook

The grid around Bibb, Georgia is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Bibb the mapped layer shows 36 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Bibb is split among 5 utilities, among them CENTRAL GEORGIA EL MEMBER CORP, FLINT ELECTRIC MEMBERSHIP CORP, GEORGIA POWER CO.

Grid position at a glance

Serving utilities
CENTRAL GEORGIA EL MEMBER CORP, FLINT ELECTRIC MEMBERSHIP CORP, GEORGIA POWER CO, SOUTHERN RIVERS ENERGY, TRI-COUNTY ELEC MEMBER CORP (GA)
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
36
Industrial retail rate
7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
5 serving utilities: 6.9 to 11.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
843 lb CO2/MWh
Water withdrawals
47 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
40,111 employed in construction within ~120 km (44 of 52 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Bibb

Read on for the public power picture of Bibb in Georgia, assembled for data center siting. At 500 kV, Bibb carries high-voltage transmission at its strongest mapped point. Bibb contains 36 mapped substations, a dense footprint that spreads interconnection options across many points.

No organized wholesale market covers Bibb, Georgia, so capacity moves through the local utility and bilateral agreements. Bibb carries the state industrial average retail rate of 7.8 cents per kWh from EIA-861, applied statewide. For Bibb, the per-utility spread is 5 serving utilities: 6.9 to 11.2¢/kWh, which qualifies but never replaces the state average.

Bibb, Georgia shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. The federal EIA-860M inventory files no planned or under-construction generation in Bibb, Georgia, a real zero rather than a gap. In eGRID, the balancing authority over Bibb shows 842.741 lb CO2 per MWh.

For Bibb, the USGS 2015 compilation records 47.39 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Bibb sits within commuting range of roughly 40,111 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Bibb here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Bibb, Georgia settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Bibb, Georgia requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Bibb, Georgia are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources