Hancock, GA: data center power outlook

Hancock, Georgia is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Hancock carries 8 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Hancock spans 4 utilities, with GEORGIA POWER CO, RAYLE ELECTRIC MEMBERSHIP CORP, TRI-COUNTY ELEC MEMBER CORP (GA) among those mapped.

Grid position at a glance

Serving utilities
GEORGIA POWER CO, RAYLE ELECTRIC MEMBERSHIP CORP, TRI-COUNTY ELEC MEMBER CORP (GA), WASHINGTON ELEC MEMBER CORP
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
8
Industrial retail rate
7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 serving utilities: 6.8 to 8.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
80 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
843 lb CO2/MWh
Water withdrawals
2.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
38,854 employed in construction within ~120 km (41 of 47 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Hancock

What follows is a screening-grade read of Hancock, Georgia, built only from named public datasets. Grid access in Hancock extends to 500 kV, a high-voltage line class. The mapped layer places 8 substations across Hancock, a moderate density.

Because Hancock, Georgia sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For Hancock, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Hancock that report an industrial rate span 4 serving utilities: 6.8 to 8.1¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Hancock, Georgia, which may be quiet or simply uningested. EIA-860M records 80 MW planned or under construction for Hancock. Hancock sits under a balancing authority that eGRID puts at 842.741 lb CO2 per MWh.

Hancock withdrew 1.95 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 38,854 people are employed in construction within a 120 km commute of Hancock (BLS QCEW), which frames staffing distance rather than free labour.

For Hancock, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Hancock, Georgia describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Hancock, Georgia, a specific address needs its own interconnection study, which this page does not attempt. The figures for Hancock, Georgia refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.