Power by county

Jefferson, GA: data center power outlook

Jefferson, Georgia is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Jefferson carries 10 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Jefferson spans 4 utilities, with EXCELSIOR ELECTRIC MEMBER CORP, GEORGIA POWER CO, JEFFERSON ELECTRIC MEMBER CORP among those mapped.

Grid position at a glance

Serving utilities
EXCELSIOR ELECTRIC MEMBER CORP, GEORGIA POWER CO, JEFFERSON ELECTRIC MEMBER CORP, WASHINGTON ELEC MEMBER CORP
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
10
Industrial retail rate
7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 serving utilities: 6.8 to 14.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
843 lb CO2/MWh
Water withdrawals
26 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
25,459 employed in construction within ~120 km (35 of 40 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Jefferson

The material below frames Jefferson, Georgia for a prospective large load, drawing only on public sources. Grid access in Jefferson extends to 500 kV, a high-voltage line class. The mapped layer places 10 substations across Jefferson, a moderate density.

Because Jefferson, Georgia sits outside an organized market, capacity and interconnection are handled by the utility and bilateral deals, not a market operator. For Jefferson, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Jefferson that report an industrial rate span 4 serving utilities: 6.8 to 14.1¢/kWh, shown as context and never as the county rate.

Across the covered feeds, Jefferson, Georgia carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Nothing is on file for Jefferson, Georgia in EIA-860M as planned or under construction, which counts as a measured zero. Jefferson sits under a balancing authority that eGRID puts at 842.741 lb CO2 per MWh.

Jefferson withdrew 25.57 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 25,459 people are employed in construction within a 120 km commute of Jefferson (BLS QCEW), which frames staffing distance rather than free labour.

For Jefferson, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Jefferson, Georgia describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Jefferson, Georgia, a specific address needs its own interconnection study, which this page does not attempt. The figures for Jefferson, Georgia refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.