The grid around Lee, Georgia is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Lee the mapped layer shows 6 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Lee is split among 5 utilities, among them ALBANY UTILITY BOARD, CRISP COUNTY POWER COMM, GEORGIA POWER CO.

Grid position at a glance

Serving utilities
ALBANY UTILITY BOARD, CRISP COUNTY POWER COMM, GEORGIA POWER CO, MITCHELL ELECTRIC MEMBER CORP, SUMTER ELECTRIC MEMBER CORP
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
6
Industrial retail rate
7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 5 serving utilities: 2.7 to 11.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
843 lb CO2/MWh
Water withdrawals
30 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
14,452 employed in construction within ~120 km (33 of 45 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Lee

Read on for the public power picture of Lee in Georgia, assembled for data center siting. At 500 kV, Lee carries high-voltage transmission at its strongest mapped point. Lee contains 6 mapped substations, a moderate footprint spread across the service area.

Lee, Georgia lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Lee carries the state industrial average retail rate of 7.8 cents per kWh from EIA-861, applied statewide. For Lee, the per-utility spread is 4 of 5 serving utilities: 2.7 to 11.4¢/kWh, which qualifies but never replaces the state average.

For Lee, Georgia, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Lee, Georgia in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Lee shows 842.741 lb CO2 per MWh.

For Lee, the USGS 2015 compilation records 30.48 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Lee sits within commuting range of roughly 14,452 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Lee here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Lee, Georgia settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Lee, Georgia requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Lee, Georgia are logged directly below, so each figure on this page can be traced back to its public dataset.