Power by county
Long, GA: data center power outlook
Long sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Long, Georgia, drawn from public datasets. Counting from the mapped infrastructure, Long holds 5 mapped substations and reaches 500 kV. Long is covered by 5 retail service territories, including CANOOCHEE ELECTRIC MEMBER CORP, COASTAL ELECTRIC MEMBER CORP, GEORGIA POWER CO.
Grid position at a glance
- Serving utilities
- CANOOCHEE ELECTRIC MEMBER CORP, COASTAL ELECTRIC MEMBER CORP, GEORGIA POWER CO, OKEFENOKE RURAL EL MEMBER CORP, SATILLA RURAL ELEC MEMBER CORPORATION
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 5
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 serving utilities: 3.7 to 10.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- 150 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 1.8 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 21,282 employed in construction within ~120 km (28 of 30 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Long
Everything here about Long, Georgia comes from public federal and state records, with the gaps left visible. Long reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. Long, Georgia carries a thin 5-substation footprint in the mapped layer, concentrating where a connection could land.
Sitting outside any organized market, Long, Georgia handles interconnection through its utility rather than a central operator. The rate for Long is the 7.8 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Long, reported per-utility industrial rates cover 5 serving utilities: 3.7 to 10.6¢/kWh, offered only as context beneath the state figure.
Across the covered feeds, Long, Georgia carries no interconnection-queue project, from either real quiet or a feed not yet loaded. Long has 150 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Long carries a grid carbon intensity of 842.741 lb CO2 per MWh in eGRID.
Reported freshwater withdrawals for all uses in Long are 1.76 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Long, some 21,282 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.
These numbers for Long are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Long, Georgia together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Long, Georgia is an address-level interconnection study; the county figures here only narrow where to look. For Long, Georgia, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.