Power by county
Spalding, GA: data center power outlook
Spalding, Georgia is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Spalding carries 20 mapped substations within its boundary, and the highest reachable grid access is 500 kV. Service in Spalding spans 5 utilities, with CENTRAL GEORGIA EL MEMBER CORP, CITY OF GRIFFIN - (GA), CITY OF HAMPTON - (GA) among those mapped.
Grid position at a glance
- Serving utilities
- CENTRAL GEORGIA EL MEMBER CORP, CITY OF GRIFFIN - (GA), CITY OF HAMPTON - (GA), COWETA-FAYETTE EL MEMBER CORP, GEORGIA POWER CO
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 20
- Industrial retail rate
- 7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 5 serving utilities: 7.1 to 10.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 843 lb CO2/MWh
- Water withdrawals
- 7.4 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 165,132 employed in construction within ~120 km (50 of 55 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Spalding
The material below frames Spalding, Georgia for a prospective large load, drawing only on public sources. Grid access in Spalding extends to 500 kV, a high-voltage line class. The mapped layer places 20 substations across Spalding, a moderate density.
Spalding, Georgia is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Spalding, the rate shown is the state industrial average of 7.8 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Spalding that report an industrial rate span 4 of 5 serving utilities: 7.1 to 10.0¢/kWh, shown as context and never as the county rate.
Across the covered feeds, Spalding, Georgia carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M lists nothing planned or under construction for Spalding, Georgia, which is a national filing and so a real zero. Spalding sits under a balancing authority that eGRID puts at 842.741 lb CO2 per MWh.
Spalding withdrew 7.42 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 165,132 people are employed in construction within a 120 km commute of Spalding (BLS QCEW), which frames staffing distance rather than free labour.
For Spalding, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Spalding, Georgia describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Spalding, Georgia, a specific address needs its own interconnection study, which this page does not attempt. The figures for Spalding, Georgia refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.