Power by county

Warren, GA: data center power outlook

Warren sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Warren, Georgia, drawn from public datasets. Counting from the mapped infrastructure, Warren holds 6 mapped substations and reaches 500 kV. Warren is covered by 4 retail service territories, including GEORGIA POWER CO, JEFFERSON ELECTRIC MEMBER CORP, RAYLE ELECTRIC MEMBERSHIP CORP.

Grid position at a glance

Serving utilities
GEORGIA POWER CO, JEFFERSON ELECTRIC MEMBER CORP, RAYLE ELECTRIC MEMBERSHIP CORP, WASHINGTON ELEC MEMBER CORP
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
500 kV
Substations in county
6
Industrial retail rate
7.8¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 serving utilities: 6.8 to 8.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
107 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
843 lb CO2/MWh
Water withdrawals
1.1 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
37,863 employed in construction within ~120 km (41 of 45 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Warren

Everything here about Warren, Georgia comes from public federal and state records, with the gaps left visible. Warren reaches 500 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 6 substations mapped, Warren has a moderate spread of interconnection points.

Warren, Georgia is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. The rate for Warren is the 7.8 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Warren, reported per-utility industrial rates cover 4 serving utilities: 6.8 to 8.7¢/kWh, offered only as context beneath the state figure.

No interconnection-queue project is on record for Warren, Georgia in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Warren has 107 MW of planned or under-construction generation on file in EIA-860M. The balancing authority covering Warren carries a grid carbon intensity of 842.741 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Warren are 1.07 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Warren, some 37,863 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Warren are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Warren, Georgia together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Warren, Georgia is an address-level interconnection study; the county figures here only narrow where to look. For Warren, Georgia, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.

Sources