Power by county

Butte, ID: data center power outlook

Butte sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Butte, Idaho, drawn from public datasets. Counting from the mapped infrastructure, Butte holds 22 mapped substations and reaches 230 kV. Butte is covered by 3 retail service territories, including IDAHO POWER CO, LOST RIVER ELECTRIC COOP INC, PACIFICORP.

Grid position at a glance

Serving utilities
IDAHO POWER CO, LOST RIVER ELECTRIC COOP INC, PACIFICORP
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
230 kV
Substations in county
22
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
2 of 3 serving utilities: 8.1 to 8.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
225 lb CO2/MWh
Water withdrawals
194 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
7,253 employed in construction within ~120 km (8 of 9 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Butte

Below, Butte in Idaho is described from public data as a starting point for siting diligence. Butte reaches 230 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 22 substations mapped, Butte offers interconnection points across many locations.

Butte, Idaho is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. The rate for Butte is the 8.0 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Butte, reported per-utility industrial rates cover 2 of 3 serving utilities: 8.1 to 8.3¢/kWh, offered only as context beneath the state figure.

The covered queue feeds list nothing for Butte, Idaho, which may be quiet or simply uningested. EIA-860M lists nothing planned or under construction for Butte, Idaho, which is a national filing and so a real zero. The balancing authority covering Butte carries a grid carbon intensity of 225.071 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Butte are 193.72 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Butte, some 7,253 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Butte are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Butte, Idaho together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Butte, Idaho is an address-level interconnection study; the county figures here only narrow where to look. For Butte, Idaho, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.

Sources