Power by county
Caribou, ID: data center power outlook
Caribou, Idaho is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Caribou carries 37 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Caribou spans 5 utilities, with CITY OF SODA SPRINGS - (ID), IDAHO POWER CO, LOWER VALLEY ENERGY INC among those mapped.
Grid position at a glance
- Serving utilities
- CITY OF SODA SPRINGS - (ID), IDAHO POWER CO, LOWER VALLEY ENERGY INC, PACIFICORP, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 345 kV
- Substations in county
- 37
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 5 serving utilities: 5.0 to 8.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 225 lb CO2/MWh
- Water withdrawals
- 505 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 16,100 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Caribou
What follows is a screening-grade read of Caribou, Idaho, built only from named public datasets. Grid access in Caribou extends to 345 kV, a high-voltage line class. The mapped layer packs 37 substations into Caribou, a dense spread of options.
Sitting outside any organized market, Caribou, Idaho handles interconnection through its utility rather than a central operator. For Caribou, the rate shown is the state industrial average of 8.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Caribou that report an industrial rate span 3 of 5 serving utilities: 5.0 to 8.3¢/kWh, shown as context and never as the county rate.
No interconnection-queue project is on record for Caribou, Idaho in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Nothing is on file for Caribou, Idaho in EIA-860M as planned or under construction, which counts as a measured zero. Caribou sits under a balancing authority that eGRID puts at 225.071 lb CO2 per MWh.
Caribou withdrew 504.97 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 16,100 people are employed in construction within a 120 km commute of Caribou (BLS QCEW), which frames staffing distance rather than free labour.
For Caribou, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Caribou, Idaho describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Caribou, Idaho, a specific address needs its own interconnection study, which this page does not attempt. The figures for Caribou, Idaho refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.