Power by county
Shoshone, ID: data center power outlook
The grid around Shoshone, Idaho is summarized here from public data, starting from the county's position in an area outside an organized wholesale market. Inside Shoshone the mapped layer shows 11 mapped substations, with grid access reaching 500 kV at its strongest point. Retail service across Shoshone is split among 6 utilities, among them AVISTA CORP, BONNEVILLE POWER ADMINISTRATION, CLEARWATER POWER COMPANY.
Grid position at a glance
- Serving utilities
- AVISTA CORP, BONNEVILLE POWER ADMINISTRATION, CLEARWATER POWER COMPANY, KOOTENAI ELECTRIC COOPERATIVE, NORTHERN LIGHTS, INC, NORTHWESTERN ENERGY LLC - (MT)
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 500 kV
- Substations in county
- 11
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 5.6 to 7.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 359 lb CO2/MWh
- Water withdrawals
- 8.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 25,163 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Shoshone
Read on for the public power picture of Shoshone in Idaho, assembled for data center siting. At 500 kV, Shoshone carries high-voltage transmission at its strongest mapped point. Shoshone contains 11 mapped substations, a moderate footprint spread across the service area.
Shoshone, Idaho lies outside an organized wholesale market, so generation and transmission are arranged bilaterally and through the local utility rather than a central market operator. Shoshone carries the state industrial average retail rate of 8.0 cents per kWh from EIA-861, applied statewide. For Shoshone, the per-utility spread is 3 of 6 serving utilities: 5.6 to 7.6¢/kWh, which qualifies but never replaces the state average.
Shoshone, Idaho shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. For Shoshone, Idaho, the EIA-860M inventory shows no planned or under-construction generation, a measured absence. In eGRID, the balancing authority over Shoshone shows 358.777 lb CO2 per MWh.
For Shoshone, the USGS 2015 compilation records 7.95 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Shoshone sits within commuting range of roughly 25,163 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Shoshone here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Shoshone, Idaho settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Shoshone, Idaho requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Shoshone, Idaho are logged directly below, so each figure on this page can be traced back to its public dataset.