Teton sits in an area outside an organized wholesale market; what follows is the screening-grade grid picture for Teton, Idaho, drawn from public datasets. Counting from the mapped infrastructure, Teton holds 11 mapped substations and reaches 138 kV. Teton is covered by 2 retail service territories, including FALL RIVER RURAL ELEC COOP INC, LOWER VALLEY ENERGY INC.

Grid position at a glance

Serving utilities
FALL RIVER RURAL ELEC COOP INC, LOWER VALLEY ENERGY INC
ISO / market
NON_ISO (Not in an organized wholesale market)
Highest grid access
138 kV
Substations in county
11
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 2 serving utilities: 5.0¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
225 lb CO2/MWh
Water withdrawals
407 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
13,109 employed in construction within ~120 km (8 of 9 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Teton

Everything here about Teton, Idaho comes from public federal and state records, with the gaps left visible. Teton reaches 138 kV at its highest mapped voltage, a transmission class that can carry a substantial interconnection where capacity exists. With 11 substations mapped, Teton has a moderate spread of interconnection points.

Teton, Idaho is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. The rate for Teton is the 8.0 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Teton, reported per-utility industrial rates cover 1 of 2 serving utilities: 5.0¢/kWh, offered only as context beneath the state figure.

The covered queue feeds list nothing for Teton, Idaho, which may be quiet or simply uningested. Teton, Idaho has no EIA-860M generation on file, which reads as zero rather than as a gap. The balancing authority covering Teton carries a grid carbon intensity of 225.071 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Teton are 407.45 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Teton, some 13,109 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Teton are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Teton, Idaho together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Teton, Idaho is an address-level interconnection study; the county figures here only narrow where to look. For Teton, Idaho, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.