Power by county
Cumberland, IL: data center power outlook
Cumberland, Illinois is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Cumberland carries 1 mapped substation within its boundary, and the highest reachable grid access is 345 kV. Service in Cumberland spans 6 utilities, with AMEREN ILLINOIS COMPANY, CITY OF CASEY - (IL), COLES-MOULTRIE ELECTRIC COOP among those mapped.
Grid position at a glance
- Serving utilities
- AMEREN ILLINOIS COMPANY, CITY OF CASEY - (IL), COLES-MOULTRIE ELECTRIC COOP, NORRIS ELECTRIC COOP, SOUTHWESTERN ELECTRIC COOP INC - (IL), VILLAGE OF GREENUP - (IL)
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 345 kV
- Substations in county
- 1
- Industrial retail rate
- 10.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 4 of 6 serving utilities: 1.6 to 15.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 9 projects, 1,346 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 1.3 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 22,376 employed in construction within ~120 km (35 of 36 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Cumberland
The material below frames Cumberland, Illinois for a prospective large load, drawing only on public sources. Grid access in Cumberland extends to 345 kV, a high-voltage line class. The mapped footprint in Cumberland, Illinois is sparse, 1 substation, so options cluster at those points.
Interconnection over Cumberland runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Cumberland, the rate shown is the state industrial average of 10.1 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Cumberland that report an industrial rate span 4 of 6 serving utilities: 1.6 to 15.2¢/kWh, shown as context and never as the county rate.
The queue feeds show 9 projects for Cumberland, totalling 1,346.1 MW of requested capacity. Cumberland, Illinois has no EIA-860M generation on file, which reads as zero rather than as a gap. Cumberland sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Cumberland withdrew 1.34 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 22,376 people are employed in construction within a 120 km commute of Cumberland (BLS QCEW), which frames staffing distance rather than free labour.
For Cumberland, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Cumberland, Illinois describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Cumberland, Illinois, a specific address needs its own interconnection study, which this page does not attempt. The figures for Cumberland, Illinois refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.