Kendall, IL: data center power outlook

Kendall, Illinois is served through the PJM market (PJM Interconnection), and the figures below describe the public grid around a prospective data center site there. Kendall carries 12 mapped substations within its boundary, and the highest reachable grid access is 765 kV. Service in Kendall spans 3 utilities, with AMEREN ILLINOIS COMPANY, COMMONWEALTH EDISON CO, CORN BELT ENERGY CORPORATION among those mapped.

Grid position at a glance

Serving utilities
AMEREN ILLINOIS COMPANY, COMMONWEALTH EDISON CO, CORN BELT ENERGY CORPORATION
ISO / market
PJM (PJM Interconnection)
Highest grid access
765 kV
Substations in county
12
Industrial retail rate
10.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 serving utilities: 1.6 to 7.4¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
716 lb CO2/MWh
Water withdrawals
12 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
201,766 employed in construction within ~120 km (26 of 27 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Kendall

The material below frames Kendall, Illinois for a prospective large load, drawing only on public sources. Grid access in Kendall extends to 765 kV, the extra-high-voltage class. The mapped layer places 12 substations across Kendall, a moderate density.

Interconnection over Kendall runs through the PJM market (PJM Interconnection) and its rules. For Kendall, the rate shown is the state industrial average of 10.1 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Kendall that report an industrial rate span 3 serving utilities: 1.6 to 7.4¢/kWh, shown as context and never as the county rate.

The covered queue feeds list nothing for Kendall, Illinois, which may be quiet or simply uningested. Kendall, Illinois has no EIA-860M generation on file, which reads as zero rather than as a gap. Kendall sits under a balancing authority that eGRID puts at 716.09 lb CO2 per MWh.

Kendall withdrew 11.85 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 201,766 people are employed in construction within a 120 km commute of Kendall (BLS QCEW), which frames staffing distance rather than free labour.

For Kendall, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Kendall, Illinois describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Kendall, Illinois, a specific address needs its own interconnection study, which this page does not attempt. The figures for Kendall, Illinois refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.