For Macoupin, Illinois, the public grid picture begins with its place in the MISO market (Midcontinent Independent System Operator) and the infrastructure mapped inside the county. Grid access across Macoupin tops out at 138 kV, over a footprint of 18 mapped substations. In Macoupin, 5 utilities share the retail territory, among them AMEREN ILLINOIS COMPANY, ILLINOIS RURAL ELECTRIC COOP, M J M ELECTRIC COOPERATIVE INC.
Grid position at a glance
- Serving utilities
- AMEREN ILLINOIS COMPANY, ILLINOIS RURAL ELECTRIC COOP, M J M ELECTRIC COOPERATIVE INC, RURAL ELECTRIC CONVEN COOP, SOUTHWESTERN ELECTRIC COOP INC - (IL)
- ISO / market
- MISO (Midcontinent Independent System Operator)
- Highest grid access
- 138 kV
- Substations in county
- 18
- Industrial retail rate
- 10.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 5 serving utilities: 1.6 to 11.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 3 projects, 505 MW
- Proposed generation
- 5 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 4.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 80,770 employed in construction within ~120 km (32 of 33 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Macoupin
For Macoupin, Illinois, the following sections turn public grid records into a siting-oriented summary. The strongest mapped access in Macoupin is 138 kV, squarely transmission class. Macoupin carries 18 substations in the mapped layer, spread across the county.
For Macoupin, the MISO market (Midcontinent Independent System Operator) is the operator that handles interconnection and capacity. The state industrial average retail rate is 10.1 cents per kWh, drawn from EIA-861 and applied to Macoupin at the state level rather than as a county rate. The serving utilities in Macoupin that publish a rate range 2 of 5 serving utilities: 1.6 to 11.6¢/kWh, a spread kept separate from the state average.
On record for Macoupin are 3 interconnection-queue projects, totalling 505 MW of requested capacity. Federal filings (EIA-860M) list 5 MW of generation as planned or under construction in Macoupin. Grid carbon intensity for Macoupin, via its balancing authority, is 981.982 lb CO2 per MWh in eGRID.
USGS 2015 puts freshwater withdrawals across Macoupin at 3.98 million gallons per day for all uses, a measure of use, not spare supply. Within roughly a 120 km commute of Macoupin, about 80,770 people are employed in construction (BLS QCEW), which speaks to how far crews for a multi-year build would travel, not to labour known to be free.
Read the Macoupin figures as screening-grade context: they describe the surrounding grid, not a specific parcel. The numbers for Macoupin, Illinois qualify one another, so grid access, substation density, market membership, and rate are meant to be read as a set, not in isolation. Past this screening view, siting in Macoupin, Illinois turns on a study of a particular address, something no county-level page can stand in for. Every number shown for Macoupin, Illinois traces to a public source listed below, with its retrieval date, so the provenance is auditable rather than asserted.