Pike, IL: data center power outlook

Pike, Illinois is served through the MISO market (Midcontinent Independent System Operator), and the figures below describe the public grid around a prospective data center site there. Pike carries 32 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Pike spans 7 utilities, with ADAMS ELECTRIC COOP, AMEREN ILLINOIS COMPANY, CUIVRE RIVER ELECTRIC COOP INC among those mapped.

Grid position at a glance

Serving utilities
ADAMS ELECTRIC COOP, AMEREN ILLINOIS COMPANY, CUIVRE RIVER ELECTRIC COOP INC, ILLINOIS RURAL ELECTRIC COOP, MISSOURI RURAL ELECTRIC COOP, RALLS COUNTY ELECTRIC COOP, UNION ELECTRIC CO - (MO)
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
345 kV
Substations in county
32
Industrial retail rate
10.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
1 of 7 serving utilities: 1.6¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
4 projects, 294 MW
Proposed generation
1 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
3.1 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
56,374 employed in construction within ~120 km (30 of 31 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Pike

The material below frames Pike, Illinois for a prospective large load, drawing only on public sources. Grid access in Pike extends to 345 kV, a high-voltage line class. The mapped layer packs 32 substations into Pike, a dense spread of options.

Interconnection over Pike runs through the MISO market (Midcontinent Independent System Operator) and its rules. For Pike, the rate shown is the state industrial average of 10.1 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Pike that report an industrial rate span 1 of 7 serving utilities: 1.6¢/kWh, shown as context and never as the county rate.

The queue feeds show 4 projects for Pike, totalling 294 MW of requested capacity. EIA-860M records 1 MW planned or under construction for Pike. Pike sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.

Pike withdrew 3.11 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 56,374 people are employed in construction within a 120 km commute of Pike (BLS QCEW), which frames staffing distance rather than free labour.

For Pike, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Pike, Illinois describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Pike, Illinois, a specific address needs its own interconnection study, which this page does not attempt. The figures for Pike, Illinois refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.