The grid around Richland, Illinois is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Richland the mapped layer shows 12 mapped substations, with grid access reaching 138 kV at its strongest point. Retail service across Richland is split among 5 utilities, among them AMEREN ILLINOIS COMPANY, CLAY ELECTRIC COOP INC, NORRIS ELECTRIC COOP.

Grid position at a glance

Serving utilities
AMEREN ILLINOIS COMPANY, CLAY ELECTRIC COOP INC, NORRIS ELECTRIC COOP, SOUTHWESTERN ELECTRIC COOP INC - (IL), WAYNE-WHITE COUNTIES ELEC COOP
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
138 kV
Substations in county
12
Industrial retail rate
10.1¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
4 of 5 serving utilities: 1.6 to 15.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
5 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
2.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
26,556 employed in construction within ~120 km (39 of 41 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Richland

Read on for the public power picture of Richland in Illinois, assembled for data center siting. Transmission-class access reaches 138 kV in Richland at its strongest mapped point. Richland contains 12 mapped substations, a moderate footprint spread across the service area.

Wholesale activity over Richland clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Richland carries the state industrial average retail rate of 10.1 cents per kWh from EIA-861, applied statewide. For Richland, the per-utility spread is 4 of 5 serving utilities: 1.6 to 15.2¢/kWh, which qualifies but never replaces the state average.

For Richland, Illinois, no queued project appears in the feeds currently covered. In Richland, 5 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Richland shows 981.982 lb CO2 per MWh.

For Richland, the USGS 2015 compilation records 2.04 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Richland sits within commuting range of roughly 26,556 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Richland here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Richland, Illinois settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Richland, Illinois requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Richland, Illinois are logged directly below, so each figure on this page can be traced back to its public dataset.