Power by county

Linn, IA: data center power outlook

The grid around Linn, Iowa is summarized here from public data, starting from the county's position in the MISO market (Midcontinent Independent System Operator). Inside Linn the mapped layer shows 70 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Linn is split among 8 utilities, among them CITY OF COGGON - (IA), EAST-CENTRAL IOWA RURAL ELEC COOP, EASTERN IOWA LIGHT & POWER COOP.

Grid position at a glance

Serving utilities
CITY OF COGGON - (IA), EAST-CENTRAL IOWA RURAL ELEC COOP, EASTERN IOWA LIGHT & POWER COOP, INTERSTATE POWER AND LIGHT CO, LINN COUNTY REC, MAQUOKETA VALLEY RRL ELEC COOP, MIDAMERICAN ENERGY CO, WPPI ENERGY
ISO / market
MISO (Midcontinent Independent System Operator)
Highest grid access
345 kV
Substations in county
70
Industrial retail rate
7.2¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
6 of 8 serving utilities: 6.0 to 9.2¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
15 projects, 3,011 MW
Proposed generation
100 MW planned or under constructionUnits filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
982 lb CO2/MWh
Water withdrawals
174 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
34,502 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Linn

The sections below set out what public data shows about siting a large electrical load in Linn, Iowa. At 345 kV, Linn carries high-voltage transmission at its strongest mapped point. Linn contains 70 mapped substations, a dense footprint that spreads interconnection options across many points.

Wholesale activity over Linn clears through the MISO market (Midcontinent Independent System Operator), whose footprint sets how interconnection requests and capacity are handled. Linn carries the state industrial average retail rate of 7.2 cents per kWh from EIA-861, applied statewide. For Linn, the per-utility spread is 6 of 8 serving utilities: 6.0 to 9.2¢/kWh, which qualifies but never replaces the state average.

Linn carries 15 projects in the interconnection queue, totalling 3,011 MW of requested capacity. In Linn, 100 MW is filed as planned or under construction in the federal EIA-860M inventory. In eGRID, the balancing authority over Linn shows 981.982 lb CO2 per MWh.

For Linn, the USGS 2015 compilation records 174.45 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Linn sits within commuting range of roughly 34,502 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.

Every figure for Linn here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Linn, Iowa settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Linn, Iowa requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Linn, Iowa are logged directly below, so each figure on this page can be traced back to its public dataset.

Sources