Osceola, IA: data center power outlook
Osceola, Iowa is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Osceola carries 9 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Osceola spans 11 utilities, with CITY OF BIGELOW - (MN), CITY OF SIBLEY - (IA), FEDERATED RURAL ELECTRIC ASSN among those mapped.
Grid position at a glance
- Serving utilities
- CITY OF BIGELOW - (MN), CITY OF SIBLEY - (IA), FEDERATED RURAL ELECTRIC ASSN, INTERSTATE POWER AND LIGHT CO, IOWA LAKES ELECTRIC COOP, LYON RURAL ELECTRIC COOP, MIDAMERICAN ENERGY CO, NOBLES COOPERATIVE ELECTRIC, NORTH WEST RURAL ELECTRIC COOP, OSCEOLA ELECTRIC COOP, INC, WAPA-- WESTERN AREA POWER ADMINISTRATION
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 9
- Industrial retail rate
- 7.2¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 11 serving utilities: 6.0 to 15.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- 2 projects, 174 MW
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 982 lb CO2/MWh
- Water withdrawals
- 9.1 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 24,912 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Osceola
What follows is a screening-grade read of Osceola, Iowa, built only from named public datasets. Grid access in Osceola extends to 345 kV, a high-voltage line class. The mapped layer places 9 substations across Osceola, a moderate density.
Interconnection over Osceola runs through the SPP market (Southwest Power Pool) and its rules. For Osceola, the rate shown is the state industrial average of 7.2 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Osceola that report an industrial rate span 5 of 11 serving utilities: 6.0 to 15.3¢/kWh, shown as context and never as the county rate.
The queue feeds show 2 projects for Osceola, totalling 174 MW of requested capacity. Nothing is on file for Osceola, Iowa in EIA-860M as planned or under construction, which counts as a measured zero. Osceola sits under a balancing authority that eGRID puts at 981.982 lb CO2 per MWh.
Osceola withdrew 9.05 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 24,912 people are employed in construction within a 120 km commute of Osceola (BLS QCEW), which frames staffing distance rather than free labour.
For Osceola, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Osceola, Iowa describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Osceola, Iowa, a specific address needs its own interconnection study, which this page does not attempt. The figures for Osceola, Iowa refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.