Power by county
Douglas, KS: data center power outlook
The grid around Douglas, Kansas is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Douglas the mapped layer shows 23 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Douglas is split among 6 utilities, among them 4 RIVERS ELECTRIC COOPERATIVE, INC., CITY OF BALDWIN CITY- (KS), CITY OF EUDORA - (KS).
Grid position at a glance
- Serving utilities
- 4 RIVERS ELECTRIC COOPERATIVE, INC., CITY OF BALDWIN CITY- (KS), CITY OF EUDORA - (KS), EVERGY KANSAS CENTRAL, INC, EVERGY METRO, FREESTATE ELECTRIC COOP
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 23
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 3 of 6 serving utilities: 9.0 to 9.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 19 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 73,644 employed in construction within ~120 km (28 of 29 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Douglas
Read on for the public power picture of Douglas in Kansas, assembled for data center siting. At 345 kV, Douglas carries high-voltage transmission at its strongest mapped point. Douglas contains 23 mapped substations, a dense footprint that spreads interconnection options across many points.
Wholesale activity over Douglas clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Douglas carries the state industrial average retail rate of 8.0 cents per kWh from EIA-861, applied statewide. For Douglas, the per-utility spread is 3 of 6 serving utilities: 9.0 to 9.8¢/kWh, which qualifies but never replaces the state average.
For Douglas, Kansas, no queued project appears in the feeds currently covered. No generation is filed as planned or under construction in Douglas, Kansas in the federal EIA-860M inventory, a measured zero rather than missing data. In eGRID, the balancing authority over Douglas shows 871.526 lb CO2 per MWh.
For Douglas, the USGS 2015 compilation records 18.96 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Douglas sits within commuting range of roughly 73,644 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Douglas here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Douglas, Kansas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Douglas, Kansas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Douglas, Kansas are logged directly below, so each figure on this page can be traced back to its public dataset.