Power by county

Finney, KS: data center power outlook

Finney, Kansas is served through the SPP market (Southwest Power Pool), and the figures below describe the public grid around a prospective data center site there. Finney carries 32 mapped substations within its boundary, and the highest reachable grid access is 345 kV. Service in Finney spans 9 utilities, with CITY OF GARDEN CITY, CMS ELECTRIC COOP INC, LANE-SCOTT ELECTRIC COOP, INC among those mapped.

Grid position at a glance

Serving utilities
CITY OF GARDEN CITY, CMS ELECTRIC COOP INC, LANE-SCOTT ELECTRIC COOP, INC, MIDWEST ENERGY INC, PIONEER ELECTRIC COOP, INC - (KS), SOUTHERN PIONEER ELECTRIC COMPANY, VICTORY ELECTRIC COOP ASSN INC, WESTERN COOP ELECTRIC ASSN INC, WHEATLAND ELECTRIC COOP, INC
ISO / market
SPP (Southwest Power Pool)
Highest grid access
345 kV
Substations in county
32
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
8 of 9 serving utilities: 5.7 to 13.3¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
231 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
2,387 employed in construction within ~120 km (11 of 18 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Finney

The material below frames Finney, Kansas for a prospective large load, drawing only on public sources. Grid access in Finney extends to 345 kV, a high-voltage line class. The mapped layer packs 32 substations into Finney, a dense spread of options.

Interconnection over Finney runs through the SPP market (Southwest Power Pool) and its rules. For Finney, the rate shown is the state industrial average of 8.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Finney that report an industrial rate span 8 of 9 serving utilities: 5.7 to 13.3¢/kWh, shown as context and never as the county rate.

No interconnection-queue project is on record for Finney, Kansas in the covered feeds, which reflects either genuine quiet or a queue not yet ingested. Finney, Kansas has no EIA-860M generation on file, which reads as zero rather than as a gap. Finney sits under a balancing authority that eGRID puts at 871.526 lb CO2 per MWh.

Finney withdrew 231.18 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 2,387 people are employed in construction within a 120 km commute of Finney (BLS QCEW), which frames staffing distance rather than free labour.

For Finney, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Finney, Kansas describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Finney, Kansas, a specific address needs its own interconnection study, which this page does not attempt. The figures for Finney, Kansas refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.

Sources