Power by county

Kearny, KS: data center power outlook

Kearny sits in the SPP market (Southwest Power Pool); what follows is the screening-grade grid picture for Kearny, Kansas, drawn from public datasets. Counting from the mapped infrastructure, Kearny holds 6 mapped substations and reaches 345 kV. Kearny is covered by 6 retail service territories, including CITY OF JOHNSON - (KS), CITY OF LAKIN - (KS), LANE-SCOTT ELECTRIC COOP, INC.

Grid position at a glance

Serving utilities
CITY OF JOHNSON - (KS), CITY OF LAKIN - (KS), LANE-SCOTT ELECTRIC COOP, INC, MIDWEST ENERGY INC, PIONEER ELECTRIC COOP, INC - (KS), WHEATLAND ELECTRIC COOP, INC
ISO / market
SPP (Southwest Power Pool)
Highest grid access
345 kV
Substations in county
6
Industrial retail rate
8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
Per-utility rates in county
3 of 6 serving utilities: 5.9 to 10.8¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
Interconnection queue
None on record
Proposed generation
None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
Grid carbon intensity
872 lb CO2/MWh
Water withdrawals
152 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
Construction labor near site
1,924 employed in construction within ~120 km (9 of 18 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.

Grid conditions in Kearny

Everything here about Kearny, Kansas comes from public federal and state records, with the gaps left visible. Kearny reaches 345 kV, a high-voltage transmission class, at its strongest mapped point of grid access. With 6 substations mapped, Kearny has a moderate spread of interconnection points.

Kearny falls inside the SPP market (Southwest Power Pool), which governs how its interconnection requests and capacity move. The rate for Kearny is the 8.0 cents per kWh state industrial average (EIA-861), the same figure the map colours by. Across Kearny, reported per-utility industrial rates cover 3 of 6 serving utilities: 5.9 to 10.8¢/kWh, offered only as context beneath the state figure.

Across the covered feeds, Kearny, Kansas carries no interconnection-queue project, from either real quiet or a feed not yet loaded. EIA-860M lists nothing planned or under construction for Kearny, Kansas, which is a national filing and so a real zero. The balancing authority covering Kearny carries a grid carbon intensity of 871.526 lb CO2 per MWh in eGRID.

Reported freshwater withdrawals for all uses in Kearny are 151.62 million gallons per day in the USGS 2015 compilation, existing demand rather than water free for a new load. Around Kearny, some 1,924 people work in construction within about a 120 km commute (BLS QCEW), a measure of reach, not of available crews.

These numbers for Kearny are screening-grade context for the whole county, drawn from public data with the gaps left visible. Read the figures for Kearny, Kansas together rather than one at a time: grid access matters less without substations near it, and a quiet queue reads differently inside an organized market than outside one. The next step for Kearny, Kansas is an address-level interconnection study; the county figures here only narrow where to look. For Kearny, Kansas, the source log below records where each figure comes from and when it was pulled, keeping the provenance visible.

Sources