Power by county
Wabaunsee, KS: data center power outlook
The grid around Wabaunsee, Kansas is summarized here from public data, starting from the county's position in the SPP market (Southwest Power Pool). Inside Wabaunsee the mapped layer shows 2 mapped substations, with grid access reaching 345 kV at its strongest point. Retail service across Wabaunsee is split among 8 utilities, among them 4 RIVERS ELECTRIC COOPERATIVE, INC., BLUESTEM ELECTRIC COOP INC, CITY OF ALMA - (KS).
Grid position at a glance
- Serving utilities
- 4 RIVERS ELECTRIC COOPERATIVE, INC., BLUESTEM ELECTRIC COOP INC, CITY OF ALMA - (KS), CITY OF ST MARYS - (KS), DS&O ELECTRIC COOPERATIVE, INC., EVERGY KANSAS CENTRAL, INC, FLINT HILLS RURAL E C A, INC, FREESTATE ELECTRIC COOP
- ISO / market
- SPP (Southwest Power Pool)
- Highest grid access
- 345 kV
- Substations in county
- 2
- Industrial retail rate
- 8.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 2 of 8 serving utilities: 9.0 to 9.1¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 872 lb CO2/MWh
- Water withdrawals
- 2.9 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 15,426 employed in construction within ~120 kmA large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Wabaunsee
Read on for the public power picture of Wabaunsee in Kansas, assembled for data center siting. At 345 kV, Wabaunsee carries high-voltage transmission at its strongest mapped point. Across Wabaunsee, Kansas, the mapped layer holds just 2 substations, so options gather at a handful of places.
Wholesale activity over Wabaunsee clears through the SPP market (Southwest Power Pool), whose footprint sets how interconnection requests and capacity are handled. Wabaunsee carries the state industrial average retail rate of 8.0 cents per kWh from EIA-861, applied statewide. For Wabaunsee, the per-utility spread is 2 of 8 serving utilities: 9.0 to 9.1¢/kWh, which qualifies but never replaces the state average.
Wabaunsee, Kansas shows no interconnection-queue project in the covered feeds, whether from real quiet or a feed not yet loaded. The federal EIA-860M inventory files no planned or under-construction generation in Wabaunsee, Kansas, a real zero rather than a gap. In eGRID, the balancing authority over Wabaunsee shows 871.526 lb CO2 per MWh.
For Wabaunsee, the USGS 2015 compilation records 2.93 million gallons per day of all-use freshwater withdrawals, not water available to a new load. Wabaunsee sits within commuting range of roughly 15,426 construction workers (BLS QCEW, about 120 km), most already committed elsewhere.
Every figure for Wabaunsee here is screening-grade and describes the county as a whole, not any single parcel within it. None of the figures for Wabaunsee, Kansas settles a site on its own; each one qualifies the others, and all of them come from public federal and state datasets. Settling a site in Wabaunsee, Kansas requires a study of the specific parcel, a step beyond the county-level picture drawn here. Sources and data dates for Wabaunsee, Kansas are logged directly below, so each figure on this page can be traced back to its public dataset.