Power by county
Adair, KY: data center power outlook
Adair, Kentucky is served through an area outside an organized wholesale market, and the figures below describe the public grid around a prospective data center site there. Adair carries 7 mapped substations within its boundary, and the highest reachable grid access is 69 kV. Service in Adair spans 6 utilities, with EAST KENTUCKY POWER COOP, INC, FARMERS RURAL ELECTRIC COOP CORP - (KY), KENTUCKY UTILITIES CO among those mapped.
Grid position at a glance
- Serving utilities
- EAST KENTUCKY POWER COOP, INC, FARMERS RURAL ELECTRIC COOP CORP - (KY), KENTUCKY UTILITIES CO, SOUTH KENTUCKY RURAL E C C, TAYLOR COUNTY RURAL E C C, TRI-COUNTY ELEC MEMBER CORP (TN)
- ISO / market
- NON_ISO (Not in an organized wholesale market)
- Highest grid access
- 69 kV
- Substations in county
- 7
- Industrial retail rate
- 7.0¢/kWhState-level EIA-861 industrial average. The map colours by this, not by a per-county rate.
- Per-utility rates in county
- 5 of 6 serving utilities: 5.5 to 9.7¢/kWhLowest to highest industrial rate among the utilities serving this county (EIA-861 Sales to Ultimate Customers). A spread, not the county’s rate, and it covers only the serving utilities that report one.
- Interconnection queue
- None on record
- Proposed generation
- None on file (EIA-860M)Units filed with EIA as planned or under construction (Form EIA-860M). Declared intent from the federal inventory, not the interconnection queue and not guaranteed capacity.
- Grid carbon intensity
- 1,894 lb CO2/MWh
- Water withdrawals
- 1.0 Mgal/dAll uses, freshwater. Water already withdrawn locally, not water available for a new load.
- Construction labor near site
- 23,785 employed in construction within ~120 km (37 of 48 counties reporting)A large build needs hundreds of skilled construction workers on site for one to three years. A county with few of them within commuting range means bussing crews in, per diem, and housing, which is real cost and schedule risk. This counts people employed in construction within about a 120 km drive (BLS QCEW), summed across nearby counties. It is not labor known to be available: most are already committed to other projects, and no public data reveals who is free.
Grid conditions in Adair
The material below frames Adair, Kentucky for a prospective large load, drawing only on public sources. At 69 kV, the strongest mapped access in Adair is sub-transmission class. The mapped layer places 7 substations across Adair, a moderate density.
Adair, Kentucky is not inside an organized market, which leaves interconnection to the utility and bilateral contracts. For Adair, the rate shown is the state industrial average of 7.0 cents per kWh (EIA-861), a state figure and not a county-specific one. Beneath that state average, the utilities serving Adair that report an industrial rate span 5 of 6 serving utilities: 5.5 to 9.7¢/kWh, shown as context and never as the county rate.
The covered queue feeds list nothing for Adair, Kentucky, which may be quiet or simply uningested. EIA-860M lists nothing planned or under construction for Adair, Kentucky, which is a national filing and so a real zero. Adair sits under a balancing authority that eGRID puts at 1,894.234 lb CO2 per MWh.
Adair withdrew 0.97 million gallons per day for all uses in the USGS 2015 data, which counts demand, not headroom. About 23,785 people are employed in construction within a 120 km commute of Adair (BLS QCEW), which frames staffing distance rather than free labour.
For Adair, treat this as screening-grade county context useful for narrowing a search rather than settling a site. Taken together, the figures for Adair, Kentucky describe the grid around a prospective site, drawn from public data with their gaps left visible on purpose. To move past screening in Adair, Kentucky, a specific address needs its own interconnection study, which this page does not attempt. The figures for Adair, Kentucky refresh as their public datasets do, and the exact sources and dates sit in the source log below this section.